Friday, June 14, 2013

Friday - June 14th Update

The work on the foundation of the Temple continues with more forms being added and plenty of concrete being poured.  They have also started to build the forms for the north annex and looks like it is getting ready to pour the support posts for the upper floor.


The work on digging out the south area continues.  I would love to know the amount of soil that has been removed between the Nu Skin project and the Temple.  There is a constant line of trucks hauling dirt from early morning until evening.


 
I thought that I would give you are view of the work on the underground parking area for Nu Skin.  The entrance for all underground parking is in the top left hand corner of the picture coming in form 1st West and you will go right to the Temple parking and left to Nu Skin parking.  The whole area for 2 city blocks will be underground parking.  You can see to the top of the picture the Nu Skin above ground parking structure which when finished will have a glass front and will not look like a parking structure.  Most if not all of the area in view will be landscaped and will have water features and trees.
 
The Post Office is currently an Island it stands all by itself.  There is no sure answer if the Church has purchased the land where the Post Office sits only speculation from what I hear.  If it remains it may stand out like a sore thumb!

Thursday, May 30, 2013

It has been a while!

Sorry for the long delay in posts to the blog.  Activity has continued at the Temple site but much of the work has moved along very slowely so I was not sure how much to post.  Currently they have started to prepare the basement of the Temple for footings and what appears to be an underground annex to the north.  The major work has been as I mentioned before water drainage systems, it seems wherever they would dig water appears.  I think that work has now been completed and all the water in managable.  Here are some pictures of the footing preparation.

 
Plywood forms being added for the Temple footings

                          Floor of the underground portion to the North of the Temple building

Wider view of the whole north area

Friday, February 8, 2013

February 8th Update

I have been away for a couple of weeks and have returned to see that the digging below the Temple building continues and the distance between the building and the ground continues to increase.  There is a lot of activity now to the north of the building what appears to be a temporary working quarters and a possible cement plant.



It is difficult to see in the pictures that there is a large steam shovel inside the building continuing to dig out underneath the building.  I was told that while I was away that the area that looks like a road path around the building in a circle; there was a large digging devise that came in and tunneled in that area. They said it looked as if it was drilling a concrete solution into the ground building a barrier around the building.  We assume it is to allow them to start to block off the water under ground to continue to work deeper (only speculation on my part). It does look as if they have created a water drainage system under the building.  I was told that last week there were large pools of water under the building.  It is impressive to see the building standing in the air.  As I have said before my parking stall is right to the west of the building and each day as I look out it appears as if the building is floating above me. It is really impressive!

Friday, January 11, 2013

Floating building

The work on the Temple continues and now the building is starting to "float."  I have attached a picture that shows the Northeast corner of the building has now been dug out underneath and the building is resting on the steel I beams and you can see daylight and men are walking underneath it. It looks to me that the building is possibly10 feet off the ground and they continue to progress around the building both on the inside and the outside.  It is an interesting sight!  I would love to know the amount of soil that is being hauled away, the trunks are lined up down the street and they keep digging and hauling it away.


                              The Northeast corner of the building stands above the ground

Wednesday, January 9, 2013

January 8th 2013 Update

The last few days have been interesting to watch the work around the Temple as they have sured up the base of the Temple with steel I beams and it looks like the building is now resting on all the beams.  It looks as if in the near future they will start to excavate the old foundation and start to dig down to add a possible basement and new foundation.  They have also been burying large steel pylons around the parimeter of the building which will support the ground while they excavate and build underground structures such as parking.  I have attached a picture of the machine preparing to start to drive the pylon.  It is an interesting process to watch them drive the beems which stand about 2 stories tall.  When they hit something solid which I am assuming is rocks the machine viberates the beams until it starts moving again.  Our whole bulding shakes as they viberate the beem.  It is pretty amazing that it only takes maybe 5 to 10 minutes to drive them in.  In the picture you can see that there are walls going up to the east of the building on the beams and they have already hauled out a lot of dirt.