The last few days have been interesting to watch the work around the Temple as they have sured up the base of the Temple with steel I beams and it looks like the building is now resting on all the beams. It looks as if in the near future they will start to excavate the old foundation and start to dig down to add a possible basement and new foundation. They have also been burying large steel pylons around the parimeter of the building which will support the ground while they excavate and build underground structures such as parking. I have attached a picture of the machine preparing to start to drive the pylon. It is an interesting process to watch them drive the beems which stand about 2 stories tall. When they hit something solid which I am assuming is rocks the machine viberates the beams until it starts moving again. Our whole bulding shakes as they viberate the beem. It is pretty amazing that it only takes maybe 5 to 10 minutes to drive them in. In the picture you can see that there are walls going up to the east of the building on the beams and they have already hauled out a lot of dirt.
No comments:
Post a Comment